I'm using Intel Vtune Amplifier XE to to profiling jobs and I'm confused about the selection of Duration Estimation in Project Property. If I choose Between 1min and 15min and enable multiple runs, does it mean that the duration time of multiple runs is between 1min and 15min or the single run time of target application is between 1min and 15min?
↧