I have Intel Parallel Studio XE 2017 Update 1 Pro Edition installed and integrated into VS 2015 on my Win10 64 system
I have recently installed VS 2013 Express, and I want to also integrate PS into it
I run the installer again, but on the "Choose Integration Target" page, the VS 2012 and VS 2013 check boxes are grey-filled and the VS 2015 box has a tick in it
Is it intentional that I can't integrate PS 2017 into VS 2013?
Thread Topic:
Bug Report